From Simulation to Sovereign Infrastructure

QH8 Technologies transitions from architecture validation to site-specific enforcement pilots.

Facilities operating ≥100 kW/rack qualify for Phase I.

v008-OBSIDIAN: Pilot-Ready Now

Architecture complete • Simulation-validated • Deployment-structured

This Is Standard Formation, Not Beta Testing

Liquid cooling, immersion, and hybrid systems treat symptoms.

QH8 governs root causes at the silicon-power layer.

Pilot Premise: Deterministic enforcement > reactive infrastructure.

Phase I: v008-OBSIDIAN Enforcement Validation

Deployment Scope

- Non-invasive v008 kernel integration

- Sub-20ms power excursion interception

- Real-time thermal gradient stabilization

- SHA-256 Sovereign Receipt chain

- Operator-accessible enforcement telemetry

Non-Goals

- No public benchmarks

- No performance marketing

- No data ownership transfer

- Zero orchestration disruption


QH8 Pilot Readiness

| Capability | Status | Validation | Relevance |

|------------|--------|------------|-----------|

| Enforcement Loop | ✅ Complete | Simulation | Core |

| Sovereign Receipt | ✅ Active | Crypto chain | Core |

| Kernel Intercept | ✅ Complete | Deterministic | Core |

| Thermal Model | ✅ Complete | Physics-based | Core |

| Pilot Framework | ✅ Finalized | Legal+technical | Required |

Phase I Eligibility

Qualifies

- ≥100 kW/rack (any cooling mode)

- H100/Blackwell-class AI/HPC

- Power+thermal telemetry access

- Governed validation commitmentNot a fit

- Marketing trials

- Speculative demos

- Non-critical environments

Partnership Structure

- Fixed objectives + success criteria

- Mutual obligations defined

- 90-day validation period

- Clear IP boundaries

- No lock-in

[Request Pilot Agreement & Technical Brief]

Name | Company | Role | Rack Density | Cooling Mode

Why Pilot-Led Deployment

QH8 commercializes as infrastructure standard:

Pilots → Receipts → Insurance reference → Production mandate

## Limited Intake

Phase I slots filling. Qualified facilities prioritized for Q1 2026 deployment.

QH8 forms the governed thermal standard for 100+ kW/rack compute

Pilots & Partners

Phase I Technical Brief (by request)

Pilot Partnership Agreement (by request)